chevron-down chevron-with-circle-right cross magnifying-glass plus home4 bed city pencil-ruler pencil-ruler2 compass drop2 cog wrench hammer-wrench shovel factory2 clipboard-text register license2 library2 user-plus users2 cart-full new-tab lamp cord chart-settings balance briefcase ship2 golf2 file-charts magnifier cross2 plus2 chevron-down2 rulers
Coastal Engineering Company of Orleans Cape Cod
Bass River Public Access Facility Wilbur Park Hero

Bass River Public Access Facility, Wilbur Park

Coastal Engineering Co. worked with Town of Yarmouth and Massachusetts Department of Fish and Game Office of Fishing and Boating Access on this state-funded project to include expansion of the boat ramp with a new accompanying floating dock system running parallel to the ramp, handicapped accessible fishing pier, new concrete bulkhead with a stone revetment facing, overlay paving and new layout for existing parking lot, and new storm drainage system and landscaping. The town has had very positive public response, with many visitors stopping by for fishing in Bass River or Nantucket sound, launching a boat or kayak, or just relaxing on a bench or narrow beach.

  • Topographic and hydrographic survey and site planning
  • Engineering design for ramp, pier, floating dock and storm drainage
  • Permitting for Notice of Intent with the Conservation Commission and DEP, Chapter 91 License, Army Corps of Engineers permits, and Water Quality Certificate for maintenance dredging permit
  • Construction bid documents