chevron-down chevron-with-circle-right cross magnifying-glass plus home4 bed city pencil-ruler pencil-ruler2 compass drop2 cog wrench hammer-wrench shovel factory2 clipboard-text register license2 library2 user-plus users2 cart-full new-tab lamp cord chart-settings balance briefcase ship2 golf2 file-charts magnifier cross2 plus2 chevron-down2 rulers
Coastal Engineering Company of Orleans Cape Cod
Campers Haven 38

Camper’s Haven RV Resort

Camper’s Haven is the only Cape Cod campground with its own private beach on the Nantucket Sound. The campground accommodates 275 RV units and 30 cottages. As a property that predates 1995 and has a design sewage flow greater than 15,000 gallons per day, Camper’s Haven falls under the jurisdiction of the MassDEP Groundwater Discharge Permit (GWDP) program. Coastal Engineering assisted with design, permittng, and bid and contract administration for construction of an I/A wastewater treatment plant (WWTP) to provide required wastewater treatment for the resort. Our services began with a review of available documents and records followed by preliminary discussions with MassDEP regulators. The second phase was a hydrogeologic evaluation to determine soil characteristics, groundwater flow direction and rate, and potential impacts to downgradient receptors, followed by the preparation of an engineering report. The third phase was the preparation of WWTP design plans. The fourth phase was filing of a GWDP application with MassDEP. The final phase is providing construction phase services, including bidding assistance, construction layout, and construction contract administration.

Services

  • Research and preliminary investigation
  • Hydrogeologic evaluation and report preparation
  • Wastewater treatment plant and effluent disposal facility design plans
  • Groundwater Discharge Permit application
  • Bidding and construction related services