chevron-down chevron-with-circle-right cross magnifying-glass plus home4 bed city pencil-ruler pencil-ruler2 compass drop2 cog wrench hammer-wrench shovel factory2 clipboard-text register license2 library2 user-plus users2 cart-full new-tab lamp cord chart-settings balance briefcase ship2 golf2 file-charts magnifier cross2 plus2 chevron-down2 rulers
Coastal Engineering Company of Orleans Cape Cod
Eastham Munucupal Water Project Hero

Eastham Municipal Water Project

The citizens of Eastham voted to establish a town-wide municipal water system, with Phase 1 of the system to provide service to approximately 1/3 of the town. The system includes the construction of two well fields, a water storage tank, and 45 miles of distribution piping. Coastal Engineering Co. provided land surveying services associated with route design and installation of this municipal water system and related infrastructure under a contract with Environmental Partners Group.

We performed detailed corridor location surveys for selected routes of water mains, as well as existing conditions surveys for the design and layout of utility access roads and water storage tanks. Additional surveys and preparation of easement plans were made for water systems crossing private properties and public lands.

  • Existing conditions surveys for municipal water well sites and water storage tank facilities
  • Preparation of existing conditions plans for three multi-acre sites and routes, including the Cape Cod Rail trail
  • Preparation of recordable easement plans and exhibits for both public and private lands
  • Field construction staking