Coastal Engineering Co. was hired to perform a topographic location survey related to a natural gas pipeline upgrade. Working on a tight schedule for this 9000 feet-long route spanning two towns, our team located underground utilities, drainage structures, and other pertinent items, and produced an existing conditions plan deliverable.