Coastal engineering provided engineering design and environmental permitting on local, state, and federal levels for reconstruction of a bulkhead spanning across three adjacent residential properties on Nantucket Harbor. The existing deteriorated timber sheet-pile bulkheads were replaced with a new continuous and more durable cantilevered steel sheet pile bulkhead. All the work was performed during the winter off-season.