chevron-down chevron-with-circle-right cross magnifying-glass plus home4 bed city pencil-ruler pencil-ruler2 compass drop2 cog wrench hammer-wrench shovel factory2 clipboard-text register license2 library2 user-plus users2 cart-full new-tab lamp cord chart-settings balance briefcase ship2 golf2 file-charts magnifier cross2 plus2 chevron-down2 rulers
Harbormasters Office Hero Thumb

Harbormaster’s Office

The new Marshfiled Harbormaster Facility is to be constructed on the existing town property located at Green Harbor. The proposed facility consists of two interconnected buildings, one a two story, wood frame structure to house the new Harbormaster Office, and the other a one and a half story wood frame public restrooms/shower rooms/storage and garage structure. The proposed structures will be of conventional wood frame construction supported on an elevated foundation with the lowest building floor and all proposed utilities to be situated above the FEMA base flood elevation for this area.

  • Preliminary design and final construction documents
  • Site investigation for project layout, grading, and utility modifications
  • Permit document preparation and regulatory review hearings
  • Construction bid documents
  • Construction administration