Designed for coastal resiliency, the new Marshfield Harbormaster Facility is constructed
on the existing Town pier located at Green Harbor. The facility consists of two
interconnected buildings, one a two-story structure to house the new Harbormaster Office,
public restrooms, and storage, and the other a one-and-a-half-story garage structure. The
structures are of conventional wood frame construction, supported on an elevated
structural composite foundation with the lowest building floor and all proposed utilities
situated above the FEMA base flood elevation for this area.