The Brewster Housing Authority Family Housing at Huckleberry Lane includes 24 two and
three bedroom units. During one of the septic systems inspections, it was found that two
leaching pits were overflowing into the risers and driveways. Each time the tank was
pumped, several hundred gallons of flowback from the overloaded leaching pits were also
pumped out of the septic tank. The systems were declared in hydraulic failure. Coastal
Engineering Co. developed plans for replacement of all the existing sewage disposal
systems and oversaw the project through the construction document phase, bid phase, and
construction phase