The bank in front of on three neighboring shorefront properties in Plymouth, MA was failing from the bottom up and was in need of stabilization in order to stop the erosion process. Coastal Engineering Co. designed plans to stabilize the entire bank with a combination of fiber rolls and rocks, and then planted this structural repair with vegetation. The project also included a new stairway and viewing platform.